Project details

  • Location: University of Warwick
  • Contract: Traditional

150 Bedroom Refurbishment

The scheme designed by the University, which consisted of a refurbishment of an existing Student accommodation block. The scheme was carried out during the Summer of 2017, over a period of 12 weeks from start to completion.

The Contracted works included the following systems.

  • Submain, parallel from the Sub-station to an existing Distribution system
  • Containment throughout out communal areas
  • Communal Intelligent Lighting, Led Lighting to Bedrooms and Ensuites
  • Small Power
  • Fire Alarm system
  • Access Control
  • CEAG Emergency Lighting System
  • Cat 6A Data Infrastructure
  • Supplies to Mechanical Services
  • External Lighting