• Steel Containment throughout
    %

Project details

  • Location: Mira, Nuneaton
  • Contract: Traditional

Offices and 5 Workshops

The scheme was designed by the Architects /Consultants. The construction consisted of a steel frame building with Ground and First floor Offices with 5 No adjoining workshops which incorporated Offices/ Test centres

The Contracted works included the following systems.

  • Steel Containment throughout
  • Distribution including on-board Metering
  • Submains
  • TVSS Surge Protection
  • Lightning Protection
  • Intelligent Lighting and Controls.
  • Small Power
  • L1 Fire Alarm system networked to the site wide complex
  • CCTV
  • Access Controlled
  • Intruder alarm
  • Data
  • External Lighting