Project details

  • Location: Nuneaton
  • Contract: Design and Build

Provision of Additional Car Parking

The scheme involved the re-development of an existing open car parking facility to provide a decked system to increase accessible space. The site is located within a conservation area where consideration had to be given to light pollution.

The Contracted works included the following systems.

  • Design, Development of Drawings, Lux Plots , which included the integration of existing fitting, Cable Calculations
  • Steel Containment throughout
  • Distribution
  • Submains
  • TVSS Surge Protection
  • Lightning Protection
  • Intelligent Lighting and Controls with setback facilities.
  • Upper Deck Lighting